From P&ID and risk analysis through detailed engineering, API 653 work and document-control transfer — over 94 mandates, 25,000+ hours and zero service interruptions.
Scope
Preparation of P&ID for the transformation
Process-risk analysis
Preliminary and detailed cost estimates for works on tanks and piping in dikes
Detail engineering for restoration of more than 20 tanks per API 653 requirements and Shell's new standards
3D piping in dikes for more than 20 tanks
API 653 inspection for more than 12 tanks
Construction design and management of a removable filter system
More than 94 different mandates managed with monthly and individual cost tracking
Transfer of the document-control system « Stael » to VTEK's hosting and control
Addition of more than 2,500 new drawings related to the project
More than 600 new drawings created during the project — not counting modifications to existing drawings
More than 25,000 worked hours, with peaks of 700 hours per week — without any service interruptions for any of our clients