- Preparation of P&ID for the transformation
- Process risks analysis
-
Preliminary and detailed cost estimates for works on tanks and piping in dikes
-
Detail engineering for restoration of more than 20 tanks according to the API 653 requirements and Shell new standards
-
3D piping in dikes for more than 20 tanks
-
API 653 inspection for more than 12 tanks
-
Construction design and management of a removable filter system
-
In total more than 94 different mandates managed with monthly and individual costs
-
Transfer of the document control system « Stael » towards VTEK's to host and control documents
-
Addition of more than 2500 new drawings related to the project
-
More than 600 new drawings created during the project, without counting existing drawings modifications
-
More than 25,000 worked hours, with peaks of 700 hours per week without any service interruptions for any of our clients.