Transform the Refinery into a Terminal

  • Preparation of P&ID for the transformation
  • Process risks analysis
  • Preliminary and detailed cost estimates for works on tanks and piping in dikes
  • Detail engineering for restoration of more than 20 tanks according to the API 653 requirements and Shell new standards
  • 3D piping in dikes for more than 20 tanks
  • API 653 inspection for more than 12 tanks
  • Construction design and management of a removable filter system
  • In total more than 94 different mandates managed with monthly and individual costs
  • Transfer of the document control system « Stael » towards VTEK's to host and control documents
  • Addition of more than 2500 new drawings related to the project
  • More than 600 new drawings created during the project, without counting existing drawings modifications
  • More than 25,000 worked hours, with peaks of 700 hours per week without any service interruptions for any of our clients.