Extension of the life of a tank on an oil refinery — from preliminary study to commissioning, including API 653 inspection, full re-engineering and tank hydrotests.
Scope
Prepare and issue process, structural and mechanical design for the entire project — preliminary study to commissioning
Preliminary and detailed cost estimate for tank work
Detail engineering for tank modification to meet API 653 and the new Irving standards
New floor designs and installations — with coatings and cathodic protection
Replace all valves and instruments
Aluminium dome roof designs and installations
Design and installation of new internal floating roofs
Designs and installations of new platforms
Restoration of the tank shell, with insulation
Agitator and tank-heating designs and installations