Engineering and installation of a new 39.6 m (130 ft) diameter, 16,500 m³ distillate tank — from pre-FEED through detailed engineering, procurement and construction management.
Scope
Distillate-storage tank integration
Tank foundation and berm design
Leak detection & management system
Firewater supply and access roads
Existing-facility piping interconnects
Energy-efficient electrical systems
State-of-the-art instruments for measuring and monitoring
Initial economics, feasibility, concept selection, execution plans and basis for design
Detailed engineering across process, civil earthworks & structural, mechanical, piping, electrical & instrumentation; engineering support during construction and closeout